Palm Beach SWA Processing Facility

Photo of Palm Beach SWA Processing Facility source for Bullfrog RTCs
Icon of a small flame, representing the green natural gas product

Green natural gas source

The SWA Biosolids Processing Facility is located in West Palm Beach, Florida. Using Landfill Gas (LFG), biosolids from six different wastewater treatment facilities are processed into organic fertilizer. Through this project, landfill gas is captured, cleaned, and repurposed to dry the biosolids, and the resulting fertilizer is used by agricultural, commercial, and residential applications across the Sunshine State. The landfill gas is reducing the volume of natural gas used to process the biosolids, directly displacing fossil fuel-delivered natural gas.

About our sources

We source our green electricity,Ā greenĀ natural gas, andĀ greenĀ fuel from generators and producers that meet or exceed the strictest environmental standards. By supporting these renewable sources, our community is advancing the green energy transitionĀ and building a cleaner, greener world for us all.

Read more about the Bullfrog Power difference.

Explore other sources:

Providence Bay turbine

Providence Bay Wind Farm

The Providence Bay Wind Farm is located on Manitoulin Island and currently operates 2 Enercon E48 800 kW turbines. The site generates approximately 3 million kWh of clean, emission-free power annually.

Read More...
Single wind turbine and a row of pine trees against a cloudy blue sky.

Ellershouse Wind Farm

Sometimes it takes a village to raise a turbine—and that’s exactly how locals in Ellershouse, Nova Scotia, came together to launch the first independent wind farm in the province.

Read More...

Join the 20,000 subscribers who care about the future of renewable energyĀ 

Sign up for the eBuzz, our newsletter featuring green energy updates, new product information, and stories from the community projects we support.Ā